Bathrooms in the rough
The concrete slab pours (yes, plural) are about to start. This means the drain lines for the bathrooms – current and future – need to be roughed in. This series of pipes represent the first floor toilet, the shower drain, the outlet for the washing machine, the bathroom sink drain, a stub for a future upstairs bathroom, a trap for a shop side toilet, and a shop utility sink. I know that clustering the plumbing and stacking the bathrooms simplifies things but this got a bit crowded !



Wow! It’s really starting to look like…a construction site! Isn’t that an actual discarded coffee cup in the lower left corner?
LOL – that is a bit of PVC pipe cut from the top of the drain line front-center. So technically it is “waste from the waste line” (as opposed to the “waist line” which would be much bigger.